Monday, December 19, 2011

basement - 96% done!

I had just one request for the basement (haha who am I kidding - there were a lot of requests for the basement - but one MAJOR one) .... for it to be done before the 2nd baby comes!  And, if baby came today, I think I would consider the basement done.  YAHOOO!!

Although the basement is done (96% done), we haven't "moved in" yet.  More on that commentary as I go through the pictures of the almost finished, but bare. space.

Here's Louie modeling the entrance to the playroom.  And part of the 4% that isn't done - those are french doors with glass in the door (but there is a film on the glass that still needs to be taken down).  This is the view as soon as you turn left from the stairs.


And the view as soon as you turn right from the stairs.  That's the bathroom pocket door, and to the right of that door is the door to the storage.


This is a view of the larger room.  That chair is modeling where the pool table will be set up.  The door the the right is the door under the stairs.  Those 2 half walls are separating the will be "family room/TV room" from the rest of the space.


And this is the playroom.  I need to find new knobs for the doors (thinking of something kinda fun since it's the playroom).  I am loving the built ins (I have already put some overflow toys in the space - more to come once we hit 100% done!!).


Once down the stairs, turning right brings you to this ... the "larger room".  Louie is freaked out by the mummy (which just got taken down - on December 19th).  So remember, the bathroom is to the left in this photo.  Heading straight and then turning right will lead to the pool table (where the chair is now) and the family/tv room.


Thanks to Corey for taking the pictures.  In typical Corey fashion, Ethan and I are still not welcome in the basement.  You know, there are smells down there!  So, I am really hoping that I will be able to actually hang out down there within a year.  I am thinking I will be able to get down there in February after baby recovery.  That will be a good time for me to set things up.

What's left (besides the few things I mentioned above): carpet installers are coming back because there is a large visible seem that we aren't happy with, painters will come back to touch up (and take off film on the french doors), and then we move in furniture (including setting up the pool table)!!  Overall I am super happy with the space.  It adds so much in terms of usable space.  Ethan will love it (assuming Corey lets him go down there!).

Thursday, November 3, 2011

basement update

We have drywall!!

There's been a lot done in the basement .... all the "guts" are done and now is more of the finishing work.  Here's how it's looking:

This is coming down the stairs looking right, that is the bathroom


Bathroom now towards the left of the picture, the opening is the storage room.


This is the playroom ... the big opening in the middle is the closet and to the left is a built in.


And a close up of the built in (closet to the left of the picture).


During construction, we have a HUGE blockage in the kitchen.  There is essentially a plastic tunnel from the basement door to the outdoor patio door so that the crew can come and go without tracking drywall dust all over the house.  Smart, really!  That means that to get from the kitchen to the family room we have to walk around through the front of the house (versus our usual path of straight through that tunnel).  We also have no table and Ethan's chair has moved spots. 


Another full week to finish the drywall.  Then painters are coming!!  In the meantime, we have to choose tile and a vanity for the bathroom, finish choosing carpet, and lots more little details (doors, door knobs, a french door, how to finish out the built ins, etc.).  The details are the fun and probably the most involved part.

Thursday, October 20, 2011

Framing complete

The basement is looking good!  Framing has been done so far.

Here's the playroom:



And the storage in the play room.  There is going to be one big closet, and on each side there will be built in storage for the room.  So, some of this framing will be cut out (so we don't waste the space since the usable space for a closet is really where the doors are - it gets harder to store things in the "depths" of the closet).


This is the TV room, with the half wall visible in the lower right hand of the pic):


Corey measuring for the pool table (the electricians are coming soon so we want to talk about some overhead pool table lights):


A view of the storage wall:


And, the bathroom:


Like most construction, it's very dirty down in the basement.  Well, it's actually a very clean work site.  But, a clean work site is still dirty compared to most standards.  There has been a lot of work done ... we are going to pull the crew off the basement for a day to help install our front door (yay it's being delivered soon!!!).  That won't help progress, but I think we are OK on time.  Next is electrical, then drywall, the finishing of plumbing, then floors, paint, finish work.  So, perhaps we are about 10% done?  Who knows - things always throw off my idea of a schedule in some way!

Tuesday, October 11, 2011

It's begun

We've done it again ... embarked on another major construction project on the house.  A reminder of what's happened so far (from a construction standpoint):
Then there's the minor, non construction stuff which includes paint, changing of hardware (goodbye brass fixtures), changing of most light fixtures, changing of toilet seats (seriously - we basically moved into a frat house), landscape cleaning up (including Corey's grass project which seems to be going well - it's growing), and probably many other little things I am forgetting from the past 1 year and 3 months.

It's on to the basement!!!  I am so excited for this remodel.  It will add an extra 1,500 square feet of living space to our house.  Yay!

Here's the plan.  Hope you can see it OK.


The basic flow is this: walking down the stairs to the left will be the "playroom" with a wall of closets for storage (thanks to my mom for the idea of adding those!), then an "adult TV room" next to the playroom with just a half wall so that we can play pool and still watch TV (genius, Corey).  Walking down the stairs to the right will be a half bathroom and we are "roughing in" for a bar in that area too - to be completed once we have more funds.  There will be storage behind the bathroom and to-be bar, as well as a closet under the stairs.  (some of those scribbles on the plans are Ethan's, some are mine).

The work got started last Friday with material drop off and some framing.





We anticipate the project taking probably 6 weeks.  I hope it's done by Thanksgiving.  The contractor is doing framing, electrical, plumbing, drywall, and trim finishes.  This doesn't include any flooring or paint (so we will have a bit of work left to do when they are done with the major stuff).

I always forget how much work it is to have a construction project going on ... if I didn't forget I wouldn't have taken it on now.  But, I think it will be nice to have done by the winter for Ethan to play and we definitely need it before the spring storms so we have a safe refuge.

As of now, this basement project is going better than the master bathroom!  On the master bathroom remodel day 1 we had water dripping from the bathroom downstairs into our family room.  We lived with buckets and holes in the ceiling for a few days before we had to completely move everything out of the family room to get a new ceiling.  And, when prepping for the new ceiling, the contractor put down sticky floor covering that ripped up the floor finish and caused us to have to get new floors.  Nothing happened on Friday when we started the basement - I think I like the more "non-eventful" flavor of this job already (but, there is time for something to go wrong!)