I thought today was going to be a tile day for the bathroom, but I was wrong. It was a get the shower ready for tile day. So, there is now more than just studs in the shower!
| The wall there to the left will house the shower controls so we can turn it on without getting in the actual shower. Also the shower pan was installed. |
Ready for shower floor tile tomorrow. And, based on my calculation, there is NO WAY that this will all be done by Sunday! Ha! We still have to:
-tile all the walls
-grout all the tile
-put back the toilet
-put in all fixtures for shower
-put in all fixtures like towel bars, mirrors, toilet paper holders, etc
-put in counter top
-put in sinks
-do back splash for the counter top/sink area
-touch up paint
-put up the trim
-put back all the door and window trim
-put on all the doors
That is more than 4 days of work I believe. Ugg.
And here's Ethan on the move - running to Dada to show him the remote he is holding!
Ok, so I would like to make an appointment to come spend a day in your shower....its like a spa....I think Ethan is giving Corey the remote so he can tune in the Boilers. Keep the pics coming! Love you guys.
ReplyDeleteNanette